Advanced Heart and Vascular

Mainline 6” clay piping relined with Hammerhead Bluelight technologies

Interior sanitary drains relined using Repiper water tight liners including connection liners!

Bradbury Condominium

120’ of 6” mainline 4 condos sharing one mainline all relined with Sewertronics speedy light technologies

Cleveland Browns Stadium

20’ of overhead leaking 8” sanitary line suspended 20’ in the air relined using Hammerhead Bluelight technology

Dearborn Country Club

Kitchen underground relined for 100’ using internal pipe technologies pull in place lining methods with over 7 robotic reinstatements all one in one weekend saving them 1000’s on a kitchen remodel

Jan Door Dearborn Michigan

New bathroom for employees and a broken sanitary line under the bathroom rehabilitated by Permaliner light ray technologies

Kings Mill Club House

40’ of sanitary sewer under concrete walk way multiple gas lines and fiber optic lines 14’ deep all rehabilitated by hammerhead blue light technology

Phoenix Mill

414’ of 4-6” sanitary sewer manhole to man hole all rehabilitated with internal pipe technologies pull in place lining. Saved them thousands on thousand of dollars due to landscaping, patio and parking lot all being completed before the country informed them they needed sewer replaced.

Spartan Logistics

Storm line broken and leaking in a concrete foundation that was supporting a main beam in the facility. Rehabbed with Repiper water tight liners

Tiffany’s Pizza Monroe Street Monroe MI

Basement floor excavated, back water valve added, 60’ pipe burst trenchless method from inside building to outside. Hydro excavation used to dig around utilities 13’ deep and reconnect sewer to sanitary main after pipe burst. (Absolute masterpiece) 🙂

University of Michigan Science Building #2

Hammerhead blue light technologies used to rehab over 100’ of failing 6” sanitary sewer running 15’ deep through the building and below the basement floor. A few robotic reinstatements